Check each item once it's complete and attach a photo wherever one is required. Due 3 business days before your scheduled start-up date (2 for BRUGG-only service). 1Confirm project2Checklist3Sign-off CompanyThis field is for validation purposes and should be left unchanged.Project name(Required)Equipment for this start-up(Required) OMNTEC LU OMNTEC OEL8000III / Proteus ATG Franklin EVO Veeder-Root TLS4 Veeder-Root TLS450 Pneumercator LC2000 Pneumercator TMS2000 Pneumercator TMS3000 FuelMaster FMS Gasboy TopKAT FMS Gasboy ASTRA dispenser GPI dispenser DieselPure filtration system SafeSite FOC SafeSite CMFTS SafeSite day tank / fuel oil system SafeSite FPS SafeSite FOC with LMS SafeSite AFP (auto fuel port) SafeSite LMS SafeSite DSC SafeSite heater control panel BRUGG end fittings Filled in from your start-up request. Add anything that's missing.All of the following must be complete before the technician arrives. Incomplete items lead to billed return visits. We recommend not scheduling inspections that need a working fuel system until start-up is done. All equipmentConfirm fuel will be in tanks and available for testing.(Required) Confirm fuel will be in tanks and available for testing. Confirm the tank has been grounded.(Required) Confirm the tank has been grounded. Photo: Confirm the tank has been grounded.(Required)OMNTEC LU11 items · 5 photosOMNTEC LU Panel is installed in a manned and accessible location within audible alarm hearing distance.(Required) OMNTEC LU Panel is installed in a manned and accessible location within audible alarm hearing distance. Photo: OMNTEC LU Panel is installed in a manned and accessible location…(Required)Sensor extension cables are minimum 3 conductor 22 gauge shielded with drain wire (UL-E118830 CM).(Required) Sensor extension cables are minimum 3 conductor 22 gauge shielded with drain wire (UL-E118830 CM). Power wires are installed in conduit.(Required) Power wires are installed in conduit. OMNTEC LU Panel has a chassis ground connection.(Required) OMNTEC LU Panel has a chassis ground connection. Photo: OMNTEC LU Panel has a chassis ground connection.(Required)Control-to-sensor wiring runs do not exceed 2000ft.(Required) Control-to-sensor wiring runs do not exceed 2000ft. Conduits enter OMNTEC LU Panel only through pre-formed knockouts.(Required) Conduits enter OMNTEC LU Panel only through pre-formed knockouts. Photo: Conduits enter OMNTEC LU Panel only through pre-formed knockouts.(Required)BLACK sensor wires and SHIELD DRAINS should not be connected together at sensors.(Required) BLACK sensor wires and SHIELD DRAINS should not be connected together at sensors. Sensors wiring is installed in dedicated conduit.(Required) Sensors wiring is installed in dedicated conduit. Seal-offs are installed on sensor conduits between building and tank.(Required) Seal-offs are installed on sensor conduits between building and tank. Sensor wiring connections in tank are installed in suitable weatherproof junction boxes.(Required) Sensor wiring connections in tank are installed in suitable weatherproof junction boxes. Photo: Sensor wiring connections in tank are installed in suitable…(Required)All outdoor wiring connections for sensors are sealed with epoxy sealing kits.(Required) All outdoor wiring connections for sensors are sealed with epoxy sealing kits. Photo: All outdoor wiring connections for sensors are sealed with epoxy…(Required)OMNTEC OEL8000III / Proteus16 items · 3 photosOEL8000III/Proteus monitor is properly installed indoors (or outdoors in a NEMA 4X enclosure) in an accessible location. Verify that all the equipment is wired and powered.(Required) OEL8000III/Proteus monitor is properly installed indoors (or outdoors in a NEMA 4X enclosure) in an accessible location. Verify that all the equipment is wired and powered. Photo: OEL8000III/Proteus monitor is properly installed indoors (or outdoors…(Required)Conduits enter OEL8000III only through pre-formed knockouts and intrinsically safe barrier has not been compromised.(Required) Conduits enter OEL8000III only through pre-formed knockouts and intrinsically safe barrier has not been compromised. Photo: Conduits enter OEL8000III only through pre-formed knockouts and…(Required)Power wires are installed in a separate isolated conduit.(Required) Power wires are installed in a separate isolated conduit. OEL8000III/Proteus monitor has an earth ground connected to chassis lug with 12-gauge wire (separate from field ground)(Required) OEL8000III/Proteus monitor has an earth ground connected to chassis lug with 12-gauge wire (separate from field ground) Photo: OEL8000III/Proteus monitor has an earth ground connected to chassis…(Required)Annunciator (RAS series) wires are installed in a separate isolated conduit.(Required) Annunciator (RAS series) wires are installed in a separate isolated conduit. All wiring connections in tank area are installed in suitable weatherproof enclosure and/or explosion proof junction boxes (as applicable).(Required) All wiring connections in tank area are installed in suitable weatherproof enclosure and/or explosion proof junction boxes (as applicable). Interstitial sensor is located at low point of interstitial space.(Required) Interstitial sensor is located at low point of interstitial space. Sensor wiring is 22 gauge 4 conductor twisted pair shielded with drain (OMNTEC EC-4 cable).(Required) Sensor wiring is 22 gauge 4 conductor twisted pair shielded with drain (OMNTEC EC-4 cable). Sensor shield drain wire is connected to ground terminal at sensor connector in the controller.(Required) Sensor shield drain wire is connected to ground terminal at sensor connector in the controller. OEL8000III/Proteus sensor wiring runs not to exceed 2000ft. from the controller to the further sensor.(Required) OEL8000III/Proteus sensor wiring runs not to exceed 2000ft. from the controller to the further sensor. MTG level probe wiring is 22 gauge (OMNTEC EC-2 or Belden 8761 Cable).(Required) MTG level probe wiring is 22 gauge (OMNTEC EC-2 or Belden 8761 Cable). MTG level probe wire is connected to the ground terminal at MTG connector in the controller.(Required) MTG level probe wire is connected to the ground terminal at MTG connector in the controller. OEL8000III/Proteus MTG level probe wiring runs not to exceed 1000ft. from the controller.(Required) OEL8000III/Proteus MTG level probe wiring runs not to exceed 1000ft. from the controller. All outdoor wiring connections are sealed with SK-4 epoxy sealing kits from other wires.(Required) All outdoor wiring connections are sealed with SK-4 epoxy sealing kits from other wires. Seal-offs are installed between building and tanks on probe and sensor conduits.(Required) Seal-offs are installed between building and tanks on probe and sensor conduits. MTG level probe and sensor wires are combined in a separate isolated conduit (must be kept in isolation).(Required) MTG level probe and sensor wires are combined in a separate isolated conduit (must be kept in isolation). Franklin EVO tank gauging16 items · 3 photosEVO console is properly installed indoors (or outdoors in a NEMA 4X enclosure) in an accessible location. Verify that all the equipment is wired and powered.(Required) EVO console is properly installed indoors (or outdoors in a NEMA 4X enclosure) in an accessible location. Verify that all the equipment is wired and powered. Photo: EVO console is properly installed indoors (or outdoors in a NEMA 4X…(Required)Conduits enter EVO only through pre-formed knockouts and intrinsically safe barrier has not been compromised.(Required) Conduits enter EVO only through pre-formed knockouts and intrinsically safe barrier has not been compromised. Photo: Conduits enter EVO only through pre-formed knockouts and…(Required)Power wires are installed in a separate isolated rigid conduit. Probe and sensor wiring in separate conduit.(Required) Power wires are installed in a separate isolated rigid conduit. Probe and sensor wiring in separate conduit. EVO monitor has 12-gauge min. safety ground wire connected to earth ground (separate from field ground).(Required) EVO monitor has 12-gauge min. safety ground wire connected to earth ground (separate from field ground). Photo: EVO monitor has 12-gauge min. safety ground wire connected to earth…(Required)Remote alarm wires are installed in a separate isolated conduit.(Required) Remote alarm wires are installed in a separate isolated conduit. All wiring connections in tank area are installed in suitable weatherproof enclosure and/or explosion proof junction boxes (as applicable).(Required) All wiring connections in tank area are installed in suitable weatherproof enclosure and/or explosion proof junction boxes (as applicable). Interstitial sensor is located at low point of interstitial space.(Required) Interstitial sensor is located at low point of interstitial space. Sensor wiring is 22 gauge 4 conductor twisted pair shielded.(Required) Sensor wiring is 22 gauge 4 conductor twisted pair shielded. All connections have been made with crimp connectors provided in the installation kits.(Required) All connections have been made with crimp connectors provided in the installation kits. Sensor wiring runs not to exceed 2000ft. from the controller to the further sensor.(Required) Sensor wiring runs not to exceed 2000ft. from the controller to the further sensor. Level probe wiring is minimum 22 gauge(Required) Level probe wiring is minimum 22 gauge Level probe wire is connected to the ground terminal.(Required) Level probe wire is connected to the ground terminal. Level probe wiring runs not to exceed 1000ft. from the controller.(Required) Level probe wiring runs not to exceed 1000ft. from the controller. All outdoor wiring connections are sealed (can be done later).(Required) All outdoor wiring connections are sealed (can be done later). Seal-offs are installed between building and tanks on probe and sensor conduits.(Required) Seal-offs are installed between building and tanks on probe and sensor conduits. All safety guards have been replaced in the console chassis.(Required) All safety guards have been replaced in the console chassis. Veeder-Root TLS4 / TLS45011 items · 5 photosTLS monitor is installed indoors in an accessible location within audible alarm hearing distance.(Required) TLS monitor is installed indoors in an accessible location within audible alarm hearing distance. Photo: TLS monitor is installed indoors in an accessible location within…(Required)TLS monitor has 12 gauge wire from barrier to earth ground in the power panel.(Required) TLS monitor has 12 gauge wire from barrier to earth ground in the power panel. Power wires are installed in a conduit.(Required) Power wires are installed in a conduit. TLS monitor has a chassis ground connection.(Required) TLS monitor has a chassis ground connection. Photo: TLS monitor has a chassis ground connection.(Required)Monitor to probe wiring runs do not exceed 1000 feet.(Required) Monitor to probe wiring runs do not exceed 1000 feet. Conduits enter TLS monitor only through pre-formed knockouts.(Required) Conduits enter TLS monitor only through pre-formed knockouts. Photo: Conduits enter TLS monitor only through pre-formed knockouts.(Required)Sensor to probe wiring is 14 - 18 gauge shielded cable.(Required) Sensor to probe wiring is 14 - 18 gauge shielded cable. Sensor and probe wiring is installed in a dedicated conduit.(Required) Sensor and probe wiring is installed in a dedicated conduit. Seal-offs are installed on probe and sensor conduits between building and tank.(Required) Seal-offs are installed on probe and sensor conduits between building and tank. Probe and sensor wiring connections in tank area are installed in suitable weatherproof junction boxes.(Required) Probe and sensor wiring connections in tank area are installed in suitable weatherproof junction boxes. Photo: Probe and sensor wiring connections in tank area are installed in…(Required)All outdoor wiring connections for probes and sensors are sealed with epoxy sealing kits.(Required) All outdoor wiring connections for probes and sensors are sealed with epoxy sealing kits. Photo: All outdoor wiring connections for probes and sensors are sealed with…(Required)Pneumercator LC20008 items · 6 photosThe standard LC2000 console enclosure is NEMA 12 rated for indoor installation. An optional NEMA 4/4X enclosure is available for outdoor installation. Confirm enclosure rating on the approval label located on the exterior left-hand side of the enclosure before installation outdoors and confirm LC2000 is installed in appropriate location.(Required) The standard LC2000 console enclosure is NEMA 12 rated for indoor installation. An optional NEMA 4/4X enclosure is available for outdoor installation. Confirm enclosure rating on the approval label located on the exterior left-hand side of the enclosure before installation outdoors and confirm LC2000 is installed in appropriate location. Photo: The standard LC2000 console enclosure is NEMA 12 rated for indoor…(Required)Inspect all wiring to verify proper separation of intrinsically safe and non-intrinsically safe wiring, both in and out of the LC2000. Note: Separation requirements detailed in Article 504 of the National Electrical Code.(Required) Inspect all wiring to verify proper separation of intrinsically safe and non-intrinsically safe wiring, both in and out of the LC2000. Note: Separation requirements detailed in Article 504 of the National Electrical Code. Photo: Inspect all wiring to verify proper separation of intrinsically safe…(Required)Inspect the LC2000 to verify that it has not been modified from the original factory design.(Required) Inspect the LC2000 to verify that it has not been modified from the original factory design. No holes have been drilled in the enclosure including both the exterior walls and the intrinsically safe partition wall.No unapproved hardware is installed in the LC2000.No unnecessary wiring is entering the LC2000.Photo: Inspect the LC2000 to verify that it has not been modified from the…(Required)The LC2000 is on a dedicated circuit breaker. The LC2000 may share a breaker with Pneumercator Remote Alarms and/or Displays controlled by the LC2000.(Required) The LC2000 is on a dedicated circuit breaker. The LC2000 may share a breaker with Pneumercator Remote Alarms and/or Displays controlled by the LC2000. Confirm that the LC2000 grounds are terminated at the ground buss bar in the same service panel as LC2000 power.(Required) Confirm that the LC2000 grounds are terminated at the ground buss bar in the same service panel as LC2000 power. Photo: Confirm that the LC2000 grounds are terminated at the ground buss bar…(Required)Verify all wires are properly terminated in the appropriate terminal blocks as indicated both by the device and LC2000 configuration. Any damage to the system caused by miswiring will NOT be covered in warranty.(Required) Verify all wires are properly terminated in the appropriate terminal blocks as indicated both by the device and LC2000 configuration. Any damage to the system caused by miswiring will NOT be covered in warranty. Photo: Verify all wires are properly terminated in the appropriate terminal…(Required)Confirm the specified cable or approved electrical equivalent has been used for each sensor. Complete cable details can be found in the respective installation documentation. Select cable part numbers are listed below:(Required) Confirm the specified cable or approved electrical equivalent has been used for each sensor. Complete cable details can be found in the respective installation documentation. Select cable part numbers are listed below: 2-wire sensors (such as LS 600LD-BN, LS 600): Belden 8442 22AWG, 2-Conductor3-wire sensors (such as E825): Belden 8443Verify all wiring connections in tank area are installed in suitable weatherproof junction boxes.(Required) Verify all wiring connections in tank area are installed in suitable weatherproof junction boxes. Photo: Verify all wiring connections in tank area are installed in suitable…(Required)Pneumercator TMS2000 / TMS30008 items · 4 photosLocate the enclosure rating written on the foil label on the left-hand side of the TMS. Confirm the TMS is installed in a location supported by the enclosure rating as per the table. Note: level-gauging probes, leak/point level sensors, and the WiDAM may be installed in a hazardous area.(Required) Locate the enclosure rating written on the foil label on the left-hand side of the TMS. Confirm the TMS is installed in a location supported by the enclosure rating as per the table. Note: level-gauging probes, leak/point level sensors, and the WiDAM may be installed in a hazardous area. Supported locations by enclosure ratingEnclosure ratingIndoorOutdoorOutdoor (corrosive)Hazardous location12✓4✓✓4X✓✓✓7✓✓✓✓Inspect all wiring to verify proper separation of intrinsically safe and non-intrinsically safe wiring, both in and out of the TMS. Note: Separation requirements detailed in Article 504 of the National Electrical Code.(Required) Inspect all wiring to verify proper separation of intrinsically safe and non-intrinsically safe wiring, both in and out of the TMS. Note: Separation requirements detailed in Article 504 of the National Electrical Code. Inspect the TMS to verify that it has not been modified from the original factory design.(Required) Inspect the TMS to verify that it has not been modified from the original factory design. No holes have been drilled in the enclosure including both the exterior walls and the intrinsically safe partition wall.No unapproved hardware is installed in the TMS.No unnecessary wiring is entering the TMS.Photo: Inspect the TMS to verify that it has not been modified from the…(Required)The TMS is on a dedicated circuit breaker. The TMS may share a breaker with Pneumercator Remote Alarms and/or Displays controlled by the TMS.(Required) The TMS is on a dedicated circuit breaker. The TMS may share a breaker with Pneumercator Remote Alarms and/or Displays controlled by the TMS. Confirm that the TMS has the proper grounds all returning to the ground buss bar in the service panel. A total of 3 independent ground wires (1 system and 2 intrinsically safe) are required.(Required) Confirm that the TMS has the proper grounds all returning to the ground buss bar in the service panel. A total of 3 independent ground wires (1 system and 2 intrinsically safe) are required. Photo: Confirm that the TMS has the proper grounds all returning to the…(Required)Verify all wires are properly terminated in the appropriate terminal blocks as indicated both by the device and TMS configuration. Any damage to the system caused by miswiring will NOT be covered in warranty.(Required) Verify all wires are properly terminated in the appropriate terminal blocks as indicated both by the device and TMS configuration. Any damage to the system caused by miswiring will NOT be covered in warranty. Photo: Verify all wires are properly terminated in the appropriate terminal…(Required)Confirm the specified cable or approved electrical equivalent has been used for each device. Complete cable details can be found in the respective installation documentation. Select cable part numbers are listed below:(Required) Confirm the specified cable or approved electrical equivalent has been used for each device. Complete cable details can be found in the respective installation documentation. Select cable part numbers are listed below: MP450 series magnetostrictive level probe: Belden 8441 (standard)MP500 series magnetostrictive level probe: Belden 6501FE2-wire sensors (such as LS 600LD-BN): Belden 84423-wire sensors (such as E825): Belden 8443TMS to RA200KR: Belden 8443Modbus TRU, ETD1000, RA400, MPX200: Belden 9841TMS to MWR200: Belden 6501FE and Belden 9844Verify all wiring connections in tank area are installed in suitable weatherproof junction boxes.(Required) Verify all wiring connections in tank area are installed in suitable weatherproof junction boxes. Photo: Verify all wiring connections in tank area are installed in suitable…(Required)FuelMaster FMU11 items · 1 photosConfirm all site equipment is operational, and installed in accordance with the National Electrical Code.(Required) Confirm all site equipment is operational, and installed in accordance with the National Electrical Code. Confirm site equipment is installed in accordance with the National Electrical Code. If mounted in a Class I area, the electronic components, switches and relays are located over 18-inches above grade level.(Required) Confirm site equipment is installed in accordance with the National Electrical Code. If mounted in a Class I area, the electronic components, switches and relays are located over 18-inches above grade level. Photo: Confirm site equipment is installed in accordance with the National…(Required)All connections at the FMU which are a potential shock hazard are covered and labeled.(Required) All connections at the FMU which are a potential shock hazard are covered and labeled. An emergency stop switch is present, not within 20 feet nor greater than 100 feet from the fuel island. When activated, the emergency stop switch removes power from all fueling site equipment.(Required) An emergency stop switch is present, not within 20 feet nor greater than 100 feet from the fuel island. When activated, the emergency stop switch removes power from all fueling site equipment. FMU is securely mounted with four 3/8-inch (minimum) screw anchors/attach bolts.(Required) FMU is securely mounted with four 3/8-inch (minimum) screw anchors/attach bolts. Any entry holes drilled/punched in FMU are sealed.(Required) Any entry holes drilled/punched in FMU are sealed. FMU upper cabinet and pedestal door gaskets provide weatherproof seal of internal components.(Required) FMU upper cabinet and pedestal door gaskets provide weatherproof seal of internal components. FMU upper cabinet is secured to pedestal with six screws.(Required) FMU upper cabinet is secured to pedestal with six screws. FMU board/backplate attached screws are secure.(Required) FMU board/backplate attached screws are secure. Wire/cable connections are correct and secure.(Required) Wire/cable connections are correct and secure. Board retainer for mainboard expansion cards are installed and secure.(Required) Board retainer for mainboard expansion cards are installed and secure. Gasboy TopKAT FMS7 items · 4 photosConfirm all wiring is installed and in metal conduit. Refer to "Conduit Requirements" on Page 14 of the Installation Manual. The only exception to the metal conduit requirement is RS-422 as noted in "RS-422 - SHMs" on Page 22.(Required) Confirm all wiring is installed and in metal conduit. Refer to "Conduit Requirements" on Page 14 of the Installation Manual. The only exception to the metal conduit requirement is RS-422 as noted in "RS-422 - SHMs" on Page 22. Confirm the AC and DC wiring are in separate conduits.(Required) Confirm the AC and DC wiring are in separate conduits. Photo: Confirm the AC and DC wiring are in separate conduits.(Required)Confirm the system/peripheral equipment is on a separate dedicated breaker. Refer to "Power Requirements" on Page 16 of the Installation Manual.(Required) Confirm the system/peripheral equipment is on a separate dedicated breaker. Refer to "Power Requirements" on Page 16 of the Installation Manual. Confirm the correct gauge wire is installed for the communication lines. Refer to "Wire Size" on Page 17 of the Installation Manual.(Required) Confirm the correct gauge wire is installed for the communication lines. Refer to "Wire Size" on Page 17 of the Installation Manual. Confirm the system is properly grounded.(Required) Confirm the system is properly grounded. Photo: Confirm the system is properly grounded.(Required)Confirm all conduits are connected to the fuel management system pedestal through the holes and knockouts provided by the factory.(Required) Confirm all conduits are connected to the fuel management system pedestal through the holes and knockouts provided by the factory. Photo: Confirm all conduits are connected to the fuel management system…(Required)Confirm all wiring connections in tank area are installed in suitable weatherproof junction boxes.(Required) Confirm all wiring connections in tank area are installed in suitable weatherproof junction boxes. Photo: Confirm all wiring connections in tank area are installed in suitable…(Required)Gasboy ASTRA dispenser6 items · 4 photosConfirm the dispenser is properly anchored to the tank.(Required) Confirm the dispenser is properly anchored to the tank. Photo: Confirm the dispenser is properly anchored to the tank.(Required)All plumbing must be complete and tight.(Required) All plumbing must be complete and tight. Photo: All plumbing must be complete and tight.(Required)When DC pulsers are used in the pump for connecting to Gasboy fuel management systems, AC and DC wires should not share any conduits, junction boxes or troughs.(Required) When DC pulsers are used in the pump for connecting to Gasboy fuel management systems, AC and DC wires should not share any conduits, junction boxes or troughs. All conduit work must be complete. All junction boxes must be secured. Conduits should not be sealed until the wiring is verified through proper operation.(Required) All conduit work must be complete. All junction boxes must be secured. Conduits should not be sealed until the wiring is verified through proper operation. Photo: All conduit work must be complete. All junction boxes must be…(Required)The unit must be properly grounded.(Required) The unit must be properly grounded. To avoid severe damage to the dispenser, all air pockets must be bled from the product trunk lines before attempting to dispense product.(Required) To avoid severe damage to the dispenser, all air pockets must be bled from the product trunk lines before attempting to dispense product. Photo: To avoid severe damage to the dispenser, all air pockets must be bled…(Required)GPI dispenser6 items · 2 photosWiring must be in accordance with Class I, Division 1 requirements in the applicable National Electrical Code.(Required) Wiring must be in accordance with Class I, Division 1 requirements in the applicable National Electrical Code. All conduit is rigid metal and securely fastened. Do not seal conduit until the wiring has been verified through proper operation.(Required) All conduit is rigid metal and securely fastened. Do not seal conduit until the wiring has been verified through proper operation. Photo: All conduit is rigid metal and securely fastened. Do not seal conduit…(Required)All wires are correctly routed and terminated, and the pump is properly grounded using the green ground screw located inside the electrical box. Refer to the safety precautions.(Required) All wires are correctly routed and terminated, and the pump is properly grounded using the green ground screw located inside the electrical box. Refer to the safety precautions. The AC junction box cover is securely fastened with all of the supplied bolts.(Required) The AC junction box cover is securely fastened with all of the supplied bolts. The pump is equipped with the proper options and accessories to meet the application and satisfy local, state, and federal regulations.(Required) The pump is equipped with the proper options and accessories to meet the application and satisfy local, state, and federal regulations. The hose and hose accessories are securely connected to the dispenser and have been checked for continuity.(Required) The hose and hose accessories are securely connected to the dispenser and have been checked for continuity. Photo: The hose and hose accessories are securely connected to the dispenser…(Required)DieselPure filtration11 items · 6 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the DieselPure Control Panel(s) only through pre-formed knockouts.(Required) Verify that conduits enter the DieselPure Control Panel(s) only through pre-formed knockouts. Photo: Verify that conduits enter the DieselPure Control Panel(s) only…(Required)Verify that suction line for an aboveground tank has a mechanical or electronic anti-siphon valve (applicable if any part of the storage tank is above the pump inlet connection).(Required) Verify that suction line for an aboveground tank has a mechanical or electronic anti-siphon valve (applicable if any part of the storage tank is above the pump inlet connection). Verify that all equipment is bolted down as applicable.(Required) Verify that all equipment is bolted down as applicable. Photo: Verify that all equipment is bolted down as applicable.(Required)Verify that all piping to inlet and outlet of all systems is complete and is installed as close to the fuel storage tank as possible. The return line should be piped to the opposite end of the tank.(Required) Verify that all piping to inlet and outlet of all systems is complete and is installed as close to the fuel storage tank as possible. The return line should be piped to the opposite end of the tank. Confirm that field piping is independently supported to avoid stress on the filtration system internal piping. Verify that no holes have been drilled into the enclosure.(Required) Confirm that field piping is independently supported to avoid stress on the filtration system internal piping. Verify that no holes have been drilled into the enclosure. Photo: Confirm that field piping is independently supported to avoid stress…(Required)Flush/clean piping to prevent damage to solenoid valves.(Required) Flush/clean piping to prevent damage to solenoid valves. Confirm that the high level inputs from the tank monitoring system have been wired to the DieselPure control panel.(Required) Confirm that the high level inputs from the tank monitoring system have been wired to the DieselPure control panel. Photo: Confirm that the high level inputs from the tank monitoring system…(Required)Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation.(Required) Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation. Photo: Check pump rotation. Energize the pump(s) momentarily to observe…(Required)SafeSite FOC / CMFTS / day tank10 items · 5 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts.(Required) Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts. Photo: Verify that conduits enter the SafeSite Control Panel(s) only through…(Required)Confirm that the wire size and type match the project specific drawings.(Required) Confirm that the wire size and type match the project specific drawings. Confirm wire size(s)(Required)List each wire size used, e.g. 12 AWG, 14 AWG.Verify that all day tanks, pump sets, and racks are bolted down as applicable(Required) Verify that all day tanks, pump sets, and racks are bolted down as applicable Photo: Verify that all day tanks, pump sets, and racks are bolted down as…(Required)Verify that all piping to inlet and outlet of all systems is complete.(Required) Verify that all piping to inlet and outlet of all systems is complete. Confirm that field piping is independently supported to avoid stress on the pump set piping.(Required) Confirm that field piping is independently supported to avoid stress on the pump set piping. Photo: Confirm that field piping is independently supported to avoid stress…(Required)Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation.(Required) Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation. Photo: Check pump rotation. Energize the pump(s) momentarily to observe…(Required)SafeSite FPS10 items · 5 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts.(Required) Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts. Photo: Verify that conduits enter the SafeSite Control Panel(s) only through…(Required)Confirm that the wire size and type match the project specific drawings.(Required) Confirm that the wire size and type match the project specific drawings. Confirm wire size(s)(Required)List each wire size used, e.g. 12 AWG, 14 AWG.Verify that all equipment is bolted down as applicable(Required) Verify that all equipment is bolted down as applicable Photo: Verify that all equipment is bolted down as applicable(Required)Verify that all piping to inlet and outlet of all systems is complete.(Required) Verify that all piping to inlet and outlet of all systems is complete. Confirm that field piping is independently supported to avoid stress on the pump set piping.(Required) Confirm that field piping is independently supported to avoid stress on the pump set piping. Photo: Confirm that field piping is independently supported to avoid stress…(Required)Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation.(Required) Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation. Photo: Check pump rotation. Energize the pump(s) momentarily to observe…(Required)SafeSite FOC with LMS11 items · 6 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts.(Required) Verify that conduits enter the SafeSite Control Panel(s) only through pre-formed knockouts. Photo: Verify that conduits enter the SafeSite Control Panel(s) only through…(Required)Confirm that the wire size and type match the project specific drawings.(Required) Confirm that the wire size and type match the project specific drawings. Confirm wire size(s)(Required)List each wire size used, e.g. 12 AWG, 14 AWG.Verify that all day tanks, pump sets, and racks are bolted down as applicable(Required) Verify that all day tanks, pump sets, and racks are bolted down as applicable Photo: Verify that all day tanks, pump sets, and racks are bolted down as…(Required)Verify that all piping to inlet and outlet of all systems is complete.(Required) Verify that all piping to inlet and outlet of all systems is complete. Confirm that field piping is independently supported to avoid stress on the pump set piping.(Required) Confirm that field piping is independently supported to avoid stress on the pump set piping. Photo: Confirm that field piping is independently supported to avoid stress…(Required)Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation.(Required) Check pump rotation. Energize the pump(s) momentarily to observe direction of motor fan rotation. Photo: Check pump rotation. Energize the pump(s) momentarily to observe…(Required)Verify that the tubing has been installed in accordance with the manual including:(Required) Verify that the tubing has been installed in accordance with the manual including: Clearance between tubes should be at least 1/4 inchDistance between the tubing connected to the interstitial space and the LMS manifold does not exceed 300 feetRoute tubing sloped toward the LMS manifold and avoid traps in the tubing.Conduits for connection tubing should be sealed, gas and liquid tightPhoto: Verify that the tubing has been installed in accordance with the…(Required)SafeSite AFP9 items · 4 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the SafeSite Control Panel(s).(Required) Verify that conduits enter the SafeSite Control Panel(s). Photo: Verify that conduits enter the SafeSite Control Panel(s).(Required)Confirm that the wire size and type match the project specific drawings.(Required) Confirm that the wire size and type match the project specific drawings. Confirm wire size(s)(Required)List each wire size used, e.g. 12 AWG, 14 AWG.Verify that system is bolted down as applicable(Required) Verify that system is bolted down as applicable Photo: Verify that system is bolted down as applicable(Required)Verify that all piping to inlet and outlet of all systems is complete.(Required) Verify that all piping to inlet and outlet of all systems is complete. Confirm that field piping is independently supported to avoid stress on the pump set piping.(Required) Confirm that field piping is independently supported to avoid stress on the pump set piping. Photo: Confirm that field piping is independently supported to avoid stress…(Required)SafeSite LMS7 items · 3 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that the NEMA 4X SafeSite LMS Control Panel is installed in the non-hazardous area, inside or outside, in one of these configurations:(Required) Verify that the NEMA 4X SafeSite LMS Control Panel is installed in the non-hazardous area, inside or outside, in one of these configurations: Wall mounting, within a building.Wall mounting outside, in the non-hazardous area.Pre-mounted to a rack system including the manifold. The rack can be installed outside or inside, in the non-hazardous area.Install the panel and vacuum manifold as near to the tank and/or piping being monitored as possible.Photo: Verify that the NEMA 4X SafeSite LMS Control Panel is installed in…(Required)Confirm that power wires are installed in a conduit and that lower power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that lower power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Verify that conduits enter the SafeSite LMS Control Panel(s) only through pre-formed knockouts. Note: The LMS controls may be integrated into a SafeSite FOC or SafeSite CMFTS Control Panel.(Required) Verify that conduits enter the SafeSite LMS Control Panel(s) only through pre-formed knockouts. Note: The LMS controls may be integrated into a SafeSite FOC or SafeSite CMFTS Control Panel. Photo: Verify that conduits enter the SafeSite LMS Control Panel(s) only…(Required)Confirm that wire size and type match the project specific drawings and that wiring was performed by a certified electrician who has reviewed the wiring diagrams provided.(Required) Confirm that wire size and type match the project specific drawings and that wiring was performed by a certified electrician who has reviewed the wiring diagrams provided. Verify that the tubing has been installed in accordance with the manual including:(Required) Verify that the tubing has been installed in accordance with the manual including: Clearance between tubes should be at least 1/4 inchDistance between the tubing connected to the interstitial space and the LMS manifold does not exceed 300 feetRoute tubing sloped toward the LMS manifold and avoid traps in the tubing.Conduits for connection tubing should be sealed, gas and liquid tightPhoto: Verify that the tubing has been installed in accordance with the…(Required)SafeSite DSC7 items · 3 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that all the equipment is wired and powered.(Required) Verify that all the equipment is wired and powered. Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit.(Required) Confirm that power wires are installed in a conduit and that low power devices are installed in a separate dedicated conduit. Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Photo: Verify that all system components are properly grounded.(Required)Verify that conduits enter the SafeSite DSC properly.(Required) Verify that conduits enter the SafeSite DSC properly. Photo: Verify that conduits enter the SafeSite DSC properly.(Required)Verify that all piping to inlet and outlet of all systems is complete.(Required) Verify that all piping to inlet and outlet of all systems is complete. Photo of all pumps as mounted.(Required) Photo of all pumps as mounted. Photo: Photo of all pumps as mounted.(Required)SafeSite heater control panel5 items · 2 photosVerify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings.(Required) Verify that all equipment shown on the job specific project drawings in your submittal has been received and installed. Confirm with Core that you have the final versions of all project and electrical drawings. Verify that the NEMA 4X SafeSite Heater Control Panel is installed in the non-hazardous area, inside or outside, in one of these configurations:(Required) Verify that the NEMA 4X SafeSite Heater Control Panel is installed in the non-hazardous area, inside or outside, in one of these configurations: Wall mounting, within a building.Wall mounting outside, in the non-hazardous area.Pre-mounted to a rack system. The rack can be installed outside or inside, in the non-hazardous area.Photo: Verify that the NEMA 4X SafeSite Heater Control Panel is installed in…(Required)Confirm that the correct thermocouple wiring has been used per the drawings.(Required) Confirm that the correct thermocouple wiring has been used per the drawings. Process thermocouple wire used (Type K)(Required)Over-limit thermocouple wire used (Type J)(Required)Verify that all system components are properly grounded.(Required) Verify that all system components are properly grounded. Verify tank level input is connected (recommended per the drawings); if the input is not present, confirm "jumpered".(Required) Verify tank level input is connected (recommended per the drawings); if the input is not present, confirm "jumpered". Photo: Verify tank level input is connected (recommended per the drawings);…(Required)BRUGG end fitting service8 items · 3 photosConfirm that the pipe has been unreeled in accordance with the BRUGG installation manual and is ready for final connections.(Required) Confirm that the pipe has been unreeled in accordance with the BRUGG installation manual and is ready for final connections. Photo: Confirm that the pipe has been unreeled in accordance with the BRUGG…(Required)Confirm the shrink cap at all ends of the pipes are still in place in order to prevent dirt or moisture from entering the primary or the secondary pipe. Barrier has not been compromised.(Required) Confirm the shrink cap at all ends of the pipes are still in place in order to prevent dirt or moisture from entering the primary or the secondary pipe. Barrier has not been compromised. Photo: Confirm the shrink cap at all ends of the pipes are still in place in…(Required)Verify that narrow bending radii have been avoided and that the pipe bends are in accordance with the bending radius table below.(Required) Verify that narrow bending radii have been avoided and that the pipe bends are in accordance with the bending radius table below. Bending radius (inches)TypePipe sizeMinimum bending radiusRecommended when laying in the groundFSR-HL 30/481"2040FSR-HL 48/711¼"2447FSR-HL 60/832"2859FSR-HL 98/1343"4080Confirm that the pipe has been installed with a continuous slope of at least 1/8" per foot toward the tank or the sump (if applicable).(Required) Confirm that the pipe has been installed with a continuous slope of at least 1/8" per foot toward the tank or the sump (if applicable). Confirm that the pipe is supported in accordance with the clamping distance table below, and that pipe is sufficiently supported to avoid low points or traps.(Required) Confirm that the pipe is supported in accordance with the clamping distance table below, and that pipe is sufficiently supported to avoid low points or traps. Clamping distance (inches)TypePipe sizeHorizontalVerticalFSR-HL 30/481"4755FSR-HL 48/711¼"6070FSR-HL 60/832"6570FSR-HL 98/1343"7080Photo: Confirm that the pipe is supported in accordance with the clamping…(Required)Confirm that the end fittings are on-site and immediately available for use.(Required) Confirm that the end fittings are on-site and immediately available for use. Confirm that the pipe terminations are either accessible or a safety ladder is available for use by our technician on-site.(Required) Confirm that the pipe terminations are either accessible or a safety ladder is available for use by our technician on-site. NYC projects only: Confirm that the BRUGG piping terminations are within 72-inches of the enclosure, tank or equipment served in accordance with MC1305.9.3 (as applicable). NYC projects only: Confirm that the BRUGG piping terminations are within 72-inches of the enclosure, tank or equipment served in accordance with MC1305.9.3 (as applicable). (if applicable) Initials(Required)Your name (signature)(Required)Your typed name serves as your signature. By signing, you confirm every item on this checklist is complete.Date(Required) Agreement(Required) I agree that the account must be current with Core to schedule any start-up or return visit, and that return visits or extra time on site caused by incomplete work will be billed. Start-Up Readiness Checklist